Nureg 0654, appendix 2 had specif ied elaborate meteorolog systems and sophisticated dispers i on models i. Nureg0654, supplement 3, criteria for preparation and. Federal emergency management agency fema radiological. Attachment 1 nureg 0654 cross reference 7 acronyms for attachment 1 12 general plan i. Aetna considers a food and drug administration fda approved ventricular assist device vad medically necessary for any of the. Federal register criteria for preparation and evaluation. The criteria and recommendations contained in nureg 0654 were considered by the nrc to be the generally acceptable methods for complying with the emergency response plan standards listed in 10 cfr 50. Detect, measure, sample, analyze, and assess, and objective 5. Furthermore, each npp conducted a fullvolume, annual test of all their fixedinstalled siren. Synthese bibliographique des changements dechelles. Nureg 0654 femarep1, supplement 3 nrc, 1996 would be beneficial. Issuance of nureg documents and interim staff guidance. Supplement 1 to nureg 737 superseded the meteor 01 og requirements of nureg 0654, appendix 2 by stating that only.
Protective action strategies nureg 0654 femarep1, supplement 3. Taking note of background radiation levels at sample reception center and. Siren operability tests were conducted quarterly by each npp. Manual of protective action guides and protective actions for nuclear. The guidance intended for use by state and local governments has. Nureg 737 was to incorporate into one document all fundamental requirements for nuclear plant emergency response capability from the wide range of guidance documents that the nrc had issued and to provide additional clarifications on some specific items.
Washington state fixed nuclear facility protection plan. Appendix 2, page 22 refers to proposed revision 1 to nrc regulatory guide. Furthermore, each npp conducted a fullvolume, annual test of all their fixedinstalled siren systems with success as documented in this packet. Nureg 0654 cross reference index cont nureg 0654 reference i basic plan section annex g. Radiological emergency preparedness rep program hostile. At least two weekly tests and one monthly eas test received and logged. Appendix e to part 50, section iv, paragraph 3 and the applicable provisions of section. Dec 05, 2011 start preamble start printed page 75771 agency. Nureg 0654 criteria p 227 appendix a glossary 241 appendix b letters of agreement 253 appendix c references 255 appendix d state procedures 259 appendix e nureg 0654 crosswalk 261 appendix f ohio implementation of the 2017 us. Supplement 3, revision 1, guidance for protective action strategies, draft report for comment issued march 2010, to nureg 0654 femarep1, revision 1, criteria for preparation and evaluation of radiological emergency response plans and preparedness in support. Revision of nureg 0654, supplement 3 randy sullivan and harry sherwood national radiological emergency preparedness. Modified ero staffing consistent with nureg 0654 rev.
Feb 04, 2016 outline requirements for federal support during npp emergencies. That section provides that the design objective of early warning system shall be to have the capability to essentially complete the initial notification of the public. Nureg 0654 criteria p 217 appendix a glossary 231 appendix b letters of agreement 243. Letters of agreements are listed in appendix 2, letters of agreement. Supplement 3 of nureg 0654 femarep1, nsirdprisg01, and nureg cr7002 are available in adams under accession nos. Appendix 3 of nureg 0654 sets forth the criteria to be used in evaluating whether the prompt alert and notification requirements of section iv. Emergency preparedness energy compliance consultants. If state, local, or tribal governments choose not to participate in rep planning, 44 cfr part 352 outlines the licensees obligation to develop offsite plans procedures to protect the public health and safety. Sample reception center sop 2018 state of west virginia. News media points of contact and annex e ii a, e 11 d locations 4. This document revises and adds evaluation criteria and revises appendix 3 of nureg 0654 femarep1, rev. Guidance was updated to align with revision 2 of nureg 0654 femarep1 outdated references were transferred to appendix d all previously issued supplements, appendices, and the addenda have either been folded in the nureg 0654 femarep1 document. Furthermore, the nrf, in the radiologicalnuclear incident annex, outlines requirements of the federal government in their support of npp disasters. Using the guidance found in appendix 1 of nureg 0654, knpp developed an emergency classification system.
Nureg 0654, federal emergency management agency, establishes emergency notification requirements for nuclear power plants. Correct assignments monitored, according to the state eas plan. Appendix 3 nureg evaluation criteria crosswalk the references for each evaluation criterion are for this plan only and are not all inclusive nureg 0654 fema rep1 criterion description reference in plan assignment of responsibility organization control a. Methods or solutions that differ from those described in this supplement. Specifically, nureg 0654 indicates that emergency preparedness plans include support from doe and other federal agency assets. Us nuclear regulatory commission international nuclear. The criteria include 16 plan ning standards 16 related both to on and offsite safety and 1 related solely to onsite safety. Public awareness of emergency information annex e iii a, e iii b 3.
Compliance with these regulations is determined by using the guidance in regulatory guide rg 1. Protective action recommendations for severe accidents, appendix 1 emergency action. Appendix e to part 50, section iv, paragraph 3 and the applicable provisions of section 50. Coordination statistique et relations internationales 3.
Revision of nureg 0654, supplement 3 randy sullivan and harry sherwood national radiological emergency preparedness conference. Criteria for preparation and evaluation of radiological. Nureg 0654, federal emergency agency, establishes emergency notification. Federal register emergency planning guidance for nuclear. Emergency notification information annex e iii a, e iii b 2. Diablo canyon power plant after action report improvement.
December 2016 attachment 1 nureg 0654 cross reference 0654 criteria where to refer a. Vienna high school district 3 shawnee community college. Please provide a revision to the last sentence of section c. Nuclear regulatory commission nrc is issuing supplement 3, guidance for protective action strategies, to nureg 0654 femarep1, revision 1, criteria for preparation and evaluation of radiological emergency response plans and. Early and staged evacuations provide alternative protective actions that have the effect of moving the public away from the source term in an expeditious manner. Coordinate with local emergency operations plans and community resources. The initiating conditions shall include the example conditions found in appendix 1 and all postulated accidents in the final safety analysis report fsar for the nuclear facility. State of rhode island emergency alert system eas plan.
Nuclear regulatory commission, nureg0591, october 3 1979. Supplement 3, criteria for protective action recommendations for severe accidents, draft report for interim use and comment to nureg 0654 femarep1, rev. Since the publication of nureg 0654 femarep1, revision 1, in 1980, four supplemental documents and one set of addenda have been issued. Fema document nureg 0654 femarep1 1, and this rep program manual.
The guidance in appendix 1 to nureg 0654 was clarified and illustrated in a flow diagram in nrc information notice in 8328, criteria for protective action recommendations for general emergencies, issued in may 1983. In this report, the eals prepared for a pressurized water reactor and a boiling water reactor are assessed to determine whether they meet the requirements of nureg 0654, rev. The mission of vienna high school 3 in an emergencydisaster is to. Femarep14, radiological emergency preparedness exercise manual, september 1991. In addition, five recent nuclear incidents are studied to determine how their outcomes might have been affected by the new emergency response plans. Foreword 3 table of contents 8 attachment 3 nureg 0654 cross reference 10 acronyms for attachment 3 14 general plan i. Emergency planning and preparedness since three mile island. Nureg 0654 is a joint document issued by the nuclear regulatory commission nrc and fema that contains the evaluation criteria against which fema and the nrc measure the emergency preparedness plans of nuclear power plant owners and operators and the state, local, and tribal jurisdictions in which they sit. Supplement 3, revision 1, guidance for protective action strategies, draft report for comment issued march 2010, to nureg 0654 femarep1, revision 1, criteria for preparation and evaluation of radiological emergency response plans and preparedness in support of nuclear power plants, issued november 1980. Since the publication of nureg 0654 femarep1, revision 1, in 1980, four supplemental documents and one set of addenda have been issued that update and modify specific planning and procedural elements. May 29, 2015 intention to impose nureg 0654 femarep1, revision 2, on current holders of a construction permit, operating license, early site permit, or combined license. Usnrc regulatory guides, srp branch technical positions and. These procedures were prepared by the texas state emergency.
The development and validation of a scale to measure selfcompassion. These documents are available online at the federal rulemaking web site. References to the nuclearradiological incident annex nria to. December 2020 revision log revision date notes 6 63086 7 123091 8 495 8update 3 96. Nureg 0654 femarep1, revision 1, appendix 3, applies directly to alert and notification. Diablo canyon power plant after action report improvement plan. Interpretative guide to nontax revenue in revenue statistics in africa. Each licensee provides certification of siren operability direct to fema. This analysis provides a technical basis for decision criteria that can be used by licensees and offsite response. Overview par study, nureg cr6953 volumes 1, 2 and 3 staged evacuation and shelter in place can be more protective conclusions of par study guided.
Nureg 0654 plan criteria responsibilities appendix 5. Attachment 3 nureg 0654 cross reference 10 acronyms for attachment 3 22 general plan. Guidance was updated to align with revision 2 of nureg 0654 femarep1 outdated references were transferred to appendix d all previously issued supplements, appendices, and the addenda have either been folded in the nureg 0654 femarep1 document or the rpm part ii. Review of nureg0654, supplement 3, criteria for protective. This document revises and adds evaluation criteria and revises appendix 3 to nureg. Nureg 0654 femarep1 in 1996 nrcfema, 1996 as a draft report for interim use and. Under each objective, there are multiple capability targets that align with the planning standards found in femas regulations at 44 cfr 350. Presenters name june 17, 2003august 27, 2009 3 nureg 0654 femarep1, supplement 4. Ventricular assist devices medical clinical policy bulletins aetna. Nureg 0654, federal emergency agency, establishes emergency notification requirements for nuclear power plants. This plan also addresses the requirements of the commission orders of february 25. Nureg 0654 is a joint document issued by the nuclear regulatory commission nrc and fema that contains the evaluation criteria against which fema and the nrc measure the emergency preparedness plans of nuclear power plant owners and operators and.
1531 811 722 781 1133 326 1787 36 966 894 1260 1746 520 925 1442 1640 7 1374 298 484 585 1520 905 359 1666 301